Production Notes--Great Ideas Project: Difference between revisions

From Iskomunidad
Line 63: Line 63:
* Follow-up internet connection (2 outputs) at Malcolm by DILC
* Follow-up internet connection (2 outputs) at Malcolm by DILC
* Schedule streaming test from Malcolm by DILC
* Schedule streaming test from Malcolm by DILC
* More detailed assignment for members of the Production Grp


==See Also==
==See Also==

Revision as of 23:49, 25 July 2010

Pre-Event Activities

  • communication workshop with top 5 professors
  • production of speaker's briefing materials

Stage

  • lighting
  • sound. pls watch out for bad speaking habit of blowing air into the mic or asking the question "is this working?". speaker is assured by the tech team that everything works 100%! :)
  • podium
  • chairs for the nominees and emcee
  • backdrop (enlarge GI poster on tarp or projected image)

Video

Equipment

  • how many cams? -- at least 3 (center, left & right)
  • 1 video mixer
  • 1 audio mixer
  • scaffold for cameras or at least table (cams should be elevated so as not to catch audience heads or people crossing)
  • sturdy tripods

Lobby

  • LCD panel?
  • registration
  • ushers (no latecomers, no food, no cellphone?)
  • protocols (dignitaries?)
  • programme flow (script)
  • stand-up posters/banner stands

Program

  • 2-3 mins word from UP official?
  • "intermission"? - 2-3 mins AVP on the significance of the event
  • if the nominees have material to project on screen during their talk?
  • script

online stream

  • feed to different unit that has facility (eg. College of Science Auditorium)

Others

  • stand-bye power?
  • invitations
  • souvenirs (e.g. great ideas post-it, notepad) for special guest
  • emcee
  • radio communication device for production team (camera, lights, stage director)

Production staff

production team:

  • technical group:
    • camera
    • lights
    • audio
    • stage director
    • production director
  • arts design group
    • stage design – conceptualization and execution
  • script group
    • writers

Agenda for meeting (2 Aug. 2010, 1pm, DILC)

Please feel free to add

  • Report on ocular inspection by Ohm David
  • Schedule for technical testing at Malcolm Theatre by Ohm David
  • Set schedule for lighting test at Malcolm by UPTV (pls bring light meter. output of good lighting in video, still photo and streaming)
  • Follow-up internet connection (2 outputs) at Malcolm by DILC
  • Schedule streaming test from Malcolm by DILC
  • More detailed assignment for members of the Production Grp

See Also