Venue-specific issues in vcon and streaming: Difference between revisions

From Iskomunidad
No edit summary
No edit summary
Line 65: Line 65:


==School of Economics Auditorium==
==School of Economics Auditorium==
* (undergoing renovation supposedly until Jan 2012)
* Audio: no in-house audio equipment (last visit Jan 2014)
* Low lighting
* Network: available


==UP Theater==
==UP Theater==

Revision as of 16:16, 16 April 2015

These are the issues encountered in attempts to mount vcon or live stream from ff venues:

Claro M Recto Hall

  • erratic audio feed from the hall's mixer
  • untested 202.x network
  • ad-hoc wiring required both for network and audio feed

CS Auditorium

  • erratic network connectivity
  • needs ad-hoc wiring each time you stream to the cloud

CS Institute of Biology Auditorium

  • Audio: in-house mixer do not have line out for direct recording; no available wired microphones; wireless microphones are prone to feedback
  • Network connectivity: wifi only
  • Low lighting

Executive House

  • static noise from mixer
  • windows have no curtains, backlight is problem during daytime shoot but can be solved.
  • camera positioning depends on the position of the furnitures.

GT Toyota Hall

  • erratic network connection
  • poor in-house audio system
  • static sound coming from stage speakers
  • poor lighting

Malcolm Hall

  • good network connectivity
  • erratic audio feed from the hall's mixer

Melchor Hall

  • very poor audio system
  • grounded speakers (back)
  • poor lighting

NEC Audio Visual Room

  • erratic network connection
  • poor lighting
  • audio quality better

NIGS Auditorium

  • no network connectivity

NIP Auditorium

  • wireless microphone frequency receives radio station
  • low light
  • microphone sound breaks

NISMED

  • erratic network connection
  • static noise from the audio mixer

NSRI Conference Room

  • poor audio system
  • poor audio cables for microphones

Pav 4 (Rm 4105)

  • tested 202.x network
  • no audio mixer
  • poor room acoustics

School of Economics Auditorium

  • Audio: no in-house audio equipment (last visit Jan 2014)
  • Low lighting
  • Network: available

UP Theater

  • network connection requires extended UTP cable and repeater hub




Notes

  • A schedule of 3-5 hours of field testing (prior to the date of the event itself) is mandatory.
  • For online audience feedback, please also check for connection via providers like Globe or Smart.



See Also