Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Community portal
Contributor's Page
Flipbook
Directories
Catalogs
Theses
Help Support
Getting Started
Create a New Page
Basic Formatting
Create Events and Announcements
Flibook Tutorial
Iskomunidad
Search
Search
Appearance
Log in
Personal tools
Log in
Pages for logged out editors
learn more
Contributions
Talk
Editing
The Main Library Building
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
Refresh
General
What links here
Related changes
Page information
Cargo data
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
The Main Library Building (Gonzalez Hall) Named after former U.P. President Bienvenido M. Gonzalez (1939-1951), the Main Library Building was the first building to be constructed after the University transferred from its original site in Manila to the Diliman campus. Construction of the building was started in May 1949, four months after the transfer, and finished in June 1950, with completed by January 1951. The Main Library Building stands in the very midst of the academic buildings in Diliman. It is rectangular, measuring 102.75 meters long and 20.55 meters wide, with four floors including the basement. It has a stacks unit jutting to the rear from the center, measuring 27.40 meters long and 30.55 meter wide, with provisions for 8 decks of which only five are complete to date. The decision to construct the Main Library at the center of the academic square accounts for its poor geographical orientation. In order to align it with the other buildings, its entire length runs from north to south, so that the building faces east and west, exposing readers inside to the glare of the sun the whole day. The exterior of the building has a touch of the classic by the presence of columns along the frontage. There are four massive columns extending upward to the fourth floor line the porch facing the main entrance, with an additional four columns each on both sides of the porch reaching up to the third floor. Access to the main entrance is provided by an 18-step stairway. The building is modular in design and function. The structural bay measures 6.85 meters. Internally its fixed commitments consist only of the stairs, elevator and toilets. Maximum flexibility of physical lay-out is provided by the absence of load-bearing partitions, the continuous ceiling, and modular lighting.
Summary:
Please note that all contributions to Iskomunidad may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Iskomunidad:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Search
Search
Editing
The Main Library Building
Add topic